Update - Alder Castle - 13/11/24
Another precision installation at Alder Castle. Overcoming numerous challenges with these large, double-glazed units (some curved) including weight in excess of 700kgs, manoeuvring the glass via a basement route using rotisserie glass trolleys and stepped edge units. A difficult install requiring precision timing and placement. In excess of 4 tonnes of glass in a very restricted and confined area were successfully installed.
Well done to Steve, Paul, George and the Team!